Air Conditioning Enabling Works

Preparing Your Site for Temporary Air Conditioning

Temporary air conditioning is often brought in when existing cooling plant fails, during planned replacement works or when additional cooling capacity is required. The challenge is not necessarily sourcing the equipment. It is getting that equipment installed, connected and operating effectively within the building.

Newsome provides air conditioning, enabling works that address these requirements in advance. Rather than determining equipment positions, electrical requirements, duct routes and air distribution arrangements after cooling has already been lost, we establish how temporary air conditioning would be deployed while there is time to engineer the installation properly.

The result is a site with a practical, documented strategy for introducing temporary cooling when required.

Contact Us Download Brochure

Quick Enquiry

    Start with the Cooling Requirement

    Successful contingency planning starts with understanding what needs to be maintained. An entire building may not require temporary cooling. In many cases, maintaining conditions within specific production areas, server rooms, laboratories, offices or other operationally important spaces is the priority. Newsome assesses the areas requiring cooling, their approximate heat loads, operating conditions and the consequences of temperatures moving outside acceptable limits.

    Existing air conditioning and ventilation arrangements are also reviewed. This provides the basis for selecting an appropriate temporary system and determining how conditioned air can be introduced effectively. The objective is to develop a workable temporary cooling arrangement rather than simply identify a nominal kW requirement.

    Getting Conditioned Air Where It Is Needed

    Air distribution is one of the principal considerations when planning temporary air conditioning. A temporary unit positioned outside a building is of little value unless there is a practical way of supplying cooled air to the required space and returning or exhausting air where necessary.

    Newsome can identify suitable routes through existing ductwork, external walls, doors, windows, louvres or purpose-made connection points. Where permanent modifications are appropriate, these can form part of the enabling works. This allows temporary ducting to follow a predetermined route instead of requiring openings, access arrangements or alterations to be devised during an emergency.

    Distribution within the space is considered as well. Poorly positioned temporary ductwork can create localised cold areas while leaving other parts of the room inadequately cooled. The proposed arrangement therefore considers how air will move through the space and where the cooling load is concentrated.

    Planning for Heat Rejection

    Temporary air conditioning does not remove heat from the problem simply by cooling the room. That heat still has to be rejected elsewhere. This becomes particularly important when considering temporary units within enclosed or restricted areas.

    Newsome establishes how heat will be rejected from the temporary system without creating a secondary temperature problem. Depending on the proposed equipment, this may involve condenser positioning, exhaust ducting or locating the principal cooling equipment externally. Planning this arrangement beforehand avoids a common practical problem where there is sufficient room for temporary equipment but no satisfactory means of rejecting the heat it removes.

    Talk to a temperature and humidity expert now

    Electrical Infrastructure

    Temporary air conditioning can introduce a significant additional electrical load. During the site survey, Newsome assesses the likely temporary cooling arrangement alongside the electrical infrastructure available to support it. Suitable supplies, distribution and connection points can then be incorporated into the enabling works where required.

    This means the electrical requirements have already been considered against the proposed equipment strategy, rather than discovering after an equipment failure that the available local supply cannot support the temporary cooling capacity needed.

    Equipment Positioning and Access

    The proposed location of temporary air conditioning equipment needs to work from both an engineering and logistical perspective. Newsome identifies suitable positions based on the cooling strategy, available space, air movement, heat rejection requirements and proximity to the areas being served. Delivery and installation are considered at the same time.

    Door widths, loading areas, corridors, lifts, external access and restrictions on equipment movement can all influence what can realistically be installed. For external equipment, the survey can also consider ground conditions and suitable routes for ductwork and electrical cables. Resolving these issues during contingency planning gives the site a realistic installation plan based on equipment that can actually be delivered and positioned.

    Working with Existing HVAC Systems

    Temporary air conditioning does not always need to operate independently of the building’s existing services. Where appropriate, existing ductwork, air handling equipment or ventilation infrastructure may form part of the temporary cooling strategy.

    This requires a proper understanding of the system rather than simply connecting temporary equipment to the nearest available duct. Air volumes, system resistance, existing fans, zoning and the route through which conditioned air will travel all need to be considered. Newsome can assess whether existing HVAC infrastructure can be used effectively or whether a separate temporary distribution arrangement provides the better solution. This can significantly influence both the amount of temporary equipment required and the practical installation.

    Planning for Partial Failure

    Not every air conditioning problem results in complete loss of cooling.

    A large facility may have several cooling systems, multiple zones or areas with very different operating requirements. Enabling works can therefore be developed around credible failure scenarios rather than assuming the entire building will require temporary air conditioning simultaneously. For example, the contingency strategy may prioritise an operationally critical area while existing equipment continues to serve the remainder of the building. This approach can reduce the temporary capacity and infrastructure required while protecting the areas where temperature control matters most.

    Supporting Planned HVAC Projects

    The same preparation can also simplify planned work. Replacing major air conditioning equipment can require existing systems to be unavailable for days or weeks. If the building or process cannot tolerate that interruption, temporary cooling has to become part of the project programme.

    Having suitable connections, power supplies, equipment positions and duct routes already established makes it easier to introduce temporary cooling before permanent equipment is isolated. The temporary system can then provide continuity while existing equipment is removed, repaired, upgraded or replaced.

    A Practical Temporary Cooling Strategy

    Following the survey, the site can have a clearly defined approach covering the temporary cooling duty, proposed equipment arrangement, power requirements, equipment location and air distribution strategy.

    Any permanent enabling works can then be completed under controlled conditions. When temporary air conditioning is subsequently required, the installation team is working to an established plan rather than beginning with an empty site survey and a requirement to restore cooling as quickly as possible. That distinction is particularly important where temperature control is operationally significant.

    Air Conditioning Enabling Works from Newsome

    Newsome provides industrial and commercial air conditioning services alongside temporary HVAC hire, installation and engineering support.

    This allows our engineers to consider the complete temporary installation, from the cooling requirement itself through to power, positioning, ductwork, airflow and integration with existing building services. Once the required enabling works have been identified, Newsome can complete the necessary modifications and prepare the site for future temporary cooling deployment.

    Arrange an Air Conditioning Enabling Works Survey

    If your existing air conditioning became unavailable, where would temporary equipment be positioned, how would it be powered and how would you get conditioned air to the areas that need it?

    Those questions are considerably easier to answer before a failure occurs.

    Contact Newsome to arrange an Air Conditioning Enabling Works site survey and establish a practical temporary cooling strategy for your facility.