Case Study
Domestic Hot Water System Replacement with Instantaneous Plate Heat Exchangers for Virgin Active Fulham
Overview
Client: Virgin Active Fulham
Industry: Health and Fitness / Leisure Sector (Health Clubs and Fitness Facilities)
Project Overview: Newsome has proposed a domestic hot water system replacement for Virgin Active Fulham, addressing restricted plant room space and the need for a dependable hot water supply. The solution involves replacing two existing storage cylinders with 345 kW instantaneous plate heat exchanger units operating in a duty/standby configuration. The new system is designed to provide reliable hot water production, reduce standing heat losses and allow greater flexibility for maintenance.
Newsome has developed a domestic hot water (DHW) system replacement solution for Virgin Active’s Fulham health club in London, designed to provide reliable hot water production while addressing the limitations of the existing storage cylinder arrangement.
The proposed project involves replacing two existing Ormandy Rycroft hot water cylinders with modern instantaneous plate heat exchanger units, each rated at 345 kW. Operating in a duty/standby configuration, the new system is designed to meet the facility’s hot water requirements while providing greater flexibility for maintenance and reducing the standing heat losses associated with stored hot water.
The Challenge
Virgin Active’s Fulham facility requires a dependable domestic hot water supply to support its daily operations, with demand varying throughout the day as members use the club’s facilities.
The existing system uses Ormandy Rycroft hot water storage cylinders, originally designed to deliver a stated output of 408 kW at a primary temperature of 90°C. However, replacing these cylinders presented several practical challenges, particularly due to the restricted installation height within the existing plant area.
The limited available height prevented the installation of suitably sized standard replacement cylinders. Although specially manufactured horizontal storage vessels could potentially accommodate these restrictions, their production times would not meet the project’s required turnaround.
The proposed replacement also needed to account for the facility’s operating requirements. Based on the information supplied, the system was selected to support up to 16 hours of daily operation, with a maximum hot water demand of 4,500 litres per hour and three identified peak demand periods throughout the day.
Newsome therefore needed to develop a suitable replacement arrangement that could work within the existing plant area, connect to the retained infrastructure and provide sufficient hot water production without relying on large storage cylinders.
The Solution
Following a review of the project requirements, Newsome proposed replacing the existing hot water storage cylinders with two standalone packaged instantaneous domestic hot water plate heat exchanger units.
Each unit has a selected heating capacity of 345 kW against a stated required duty of 280 kW, allowing one heat exchanger to serve the full design load while the second remains available on standby.
Unlike conventional storage cylinders, instantaneous plate heat exchangers heat domestic water as it is required, removing the need for large quantities of stored hot water. Their compact design also makes them suitable for installation in plant areas where available height is restricted.
The proposed installation includes the isolation, draining, disconnection and removal of the existing cylinders, followed by positioning and connecting the new heat exchanger units to the existing primary heating and secondary domestic hot water systems.
New copper pipework will be installed as required, alongside replacement strainers, non-return valves and safety valves where necessary. The existing secondary circulation pump will be retained, with new pipework insulated using a foil-faced finish.
To provide operational resilience, Newsome has specified a duty/standby arrangement incorporating motorised three-port valves and actuators. This will allow the system to alternate between the two units automatically, with one operating and the other available as backup.
The proposed system also includes integration with the building’s existing building management system (BMS) through Modbus communication. This will support the operation and control of the new heat exchanger arrangement within the existing building infrastructure.
Following installation, the affected domestic hot water pipework will be flushed, and the system will undergo commissioning to verify hot water production, control operation and automatic duty/standby changeover.
The Expected Benefits
The proposed replacement offers several operational benefits for Virgin Active’s Fulham facility, particularly in relation to hot water production, maintenance access and plant room requirements.
Continuous Hot Water Production
The instantaneous heat exchangers are designed to produce hot water in response to demand, rather than relying on a fixed quantity stored within cylinders. This provides a continuous generation arrangement, subject to the available primary heating capacity and the specified operating conditions.
Improved Maintenance Flexibility
The duty/standby configuration allows one heat exchanger to remain available while the other is isolated for maintenance, provided the shared services remain operational and the work does not require a wider shutdown. Each unit is selected to meet the facility’s stated design duty independently.
Reduced Standing Heat Losses
Removing the existing storage cylinders eliminates the standing heat losses associated with those vessels. Hot water is instead generated when required, although energy will still be needed to maintain the temperature of the secondary circulation system.
Compact Plant Room Installation
The packaged plate heat exchangers provide an alternative to large hot water storage cylinders, addressing the restricted height available within the existing plant area without requiring specially manufactured horizontal vessels.
Reduced Stored Water Volume
Replacing the cylinders with instantaneous generation reduces the volume of stored domestic hot water within the installation. However, the existing distribution system will continue to require appropriate water hygiene management and maintenance.
Supporting Reliable Hot Water Production for Commercial Leisure Facilities
The Virgin Active Fulham project demonstrates how Newsome approaches commercial hot water system replacements where existing infrastructure, restricted access and operational demands influence equipment selection.
By specifying two 345 kW instantaneous plate heat exchanger units with automatic duty/standby controls, Newsome has developed a proposed replacement solution that addresses the facility’s installation restrictions while supporting its stated domestic hot water requirements.
With experience in commercial heating, cooling and temperature control, Newsome provides equipment selection, installation, commissioning and maintenance support for businesses across the UK.
If you’re considering upgrading an existing commercial hot water system, contact Newsome to discuss your requirements and find out how our engineers can help.