Case Study
Integrated Temperature & Humidity Control for a Production Hall
Overview
Client: Meadow Inclusions
Industry: Food Manufacturing & Processing
Project Overview: Newsome provided Meadow Inclusions with a temporary HVAC system to control temperature and humidity within its production hall. The system combined an air handling unit, air-cooled chiller and two desiccant dehumidifiers to achieve target conditions of 18°C and 40% relative humidity within a restricted plant space.
Newsome provided Meadow Inclusions with a temporary temperature and humidity control solution for its production hall. By combining cooling, air handling and dehumidification equipment, the system delivered the required environmental conditions while working within limited space and budget constraints.
The Challenge
Meadow Inclusions approached us to address persistent high temperature and humidity levels within their production hall. The required environmental conditions were 18°C and 40% relative humidity, but achieving these conditions presented several challenges.
The available space for the HVAC plant was extremely limited, while the customer was also looking for a cost-effective temporary solution rather than committing to a permanent installation.
A conventional approach using dedicated dehumidification equipment would have required additional plant capacity and potentially more space than was available. We therefore developed an integrated system using three different types of equipment:
- Newsome AHU150 Air Handling Unit
- Newsome NR120 Air Cooled Chiller
- Two RL71 Desiccant Dehumidifiers
The key to the solution was integrating these systems so that each piece of equipment performed the part of the process for which it was most effective.
The Solution
The system was designed around the humidity control capability of the AHU150. Rather than relying entirely on the desiccant dehumidifiers to remove the substantial latent load from the production hall, the AHU was used to provide initial dehumidification.
The AHU’s separate cooling and heating coils allowed the air to be:
- Cooled below its dew point to condense and remove moisture.
- Reheated to achieve the required supply air temperature.
- Partially diverted to the dehumidifiers for further moisture removal.
- Returned from the dehumidifiers as very dry air and mixed with the main air stream before being supplied to the production area.
This approach reduced the moisture load presented to the desiccant dehumidifiers while allowing the overall system to achieve the required humidity level.
Integrated Cooling
The air-cooled chiller provided chilled water to the AHU cooling coil. The cooling coil was deliberately used not simply for sensible temperature control, but also as an important part of the dehumidification process.
By cooling the air below its dew point, moisture was removed through condensation at the AHU coil. This provided an efficient first stage of humidity reduction before the air reached the desiccant equipment.
Once the required moisture had been removed, the AHU’s heating coil was used to reheat the air. This prevented the dehumidification process from resulting in an excessively cold supply temperature and allowed the system to maintain the required 18°C space condition.
This cooling-and-reheat process was particularly valuable because it allowed the AHU150’s integrated humidity control functionality to contribute directly to the overall dehumidification duty.
Integration of the Desiccant Dehumidifiers
The two desiccant dehumidifiers provided the second stage of moisture removal.
A proportion of the conditioned air leaving the AHU was diverted through the dehumidifiers. Because the AHU had already removed a significant proportion of the moisture through cooling, the DST units were not required to handle the entire latent load independently.
The resulting dry air was then returned to the main duct system and mixed with the conditioned air before being supplied to the production hall.
The arrangement required careful consideration of airflow paths, duct routing and available plant space. The below arrangement shows the integration of the AHU supply and return ductwork with the DST equipment, including the separate wet-air discharge and dry-air return connections.
A Compact, Integrated Arrangement
One of the main design challenges was fitting the complete system into the customer’s restricted plant area. Rather than treating the AHU, chiller and dehumidifiers as separate systems, the installation was designed as a single integrated HVAC process.
The arrangement incorporated:
- AHU return and supply air connections
- Chilled water cooling from the air-cooled chiller
- AHU cooling and heating coils for cooling, dehumidification and reheat
- Diversion of conditioned air to the two DST dehumidifiers
- Dry-air return from the DST units back into the supply system
- Dedicated wet-air discharge from the dehumidifiers
- A combination of rigid and flexible ductwork to accommodate the restricted installation space
The use of flexible duct sections provided additional installation flexibility, while rigid ductwork was used where practical to provide the required airflow paths within the confined area.
The Result
The resulting temporary HVAC system provided Meadow Inclusions with a compact and technically integrated solution for controlling both temperature and humidity within the production hall.
The project demonstrates how combining different HVAC technologies can provide an effective solution where space and budget constraints make a conventional installation impractical.
Rather than simply increasing the size or number of dehumidifiers, the system used the AHU150’s humidity control capability to undertake the first stage of moisture removal, with the DST units providing additional drying capacity. The air cooled chiller supplied the cooling energy required for the initial dehumidification process, while the AHU’s heating coil provided the necessary reheat.
This coordinated approach allowed the three technologies to work together as a single system, providing the required environmental control from a compact temporary installation.
Key Project Features
- Target conditions: 18°C / 40% RH
- Equipment: AHU150 + Air Cooled Chiller + 2 × DST Desiccant Dehumidifiers
- Application: Production hall environmental control
- Key challenge: Restricted plant space and limited budget
- Design approach: Combined cooling, condensation, reheat and desiccant dehumidification
- Primary benefit: Integrated temperature and humidity control from a compact temporary HVAC installation