Chiller Enabling Works

Preparing Your Cooling System for Temporary Chiller Connection

A temporary chiller is only a rapid-response solution if the existing cooling system is ready to accept it.

Newsome provides chiller enabling works for industrial and commercial cooling systems, establishing the mechanical, electrical and practical infrastructure required to connect temporary cooling plant at short notice. The work is completed while the permanent cooling system is operational and the project can be properly engineered, rather than following a breakdown when restoring cooling becomes the immediate priority. Once complete, the site has a defined connection strategy for temporary cooling that can be used during an emergency, planned maintenance, plant replacement or periods when additional capacity is required.

Contact Us Download Brochure

Quick Enquiry

    Engineering the Temporary Connection Before It Is Needed

    The purpose of chiller enabling works is not simply to add a pair of connections to an existing chilled water circuit.

    The temporary system still needs to satisfy the hydraulic and thermal requirements of the installation. Newsome starts with a site survey and technical assessment of the existing cooling system. We establish the required cooling duty, design flow and return temperatures, fluid type and concentration, flow rate, available pressure and the characteristics of the equipment or process being served. The existing pumps, pipework, valves, controls and electrical infrastructure are considered alongside the proposed temporary arrangement. This allows the connection strategy to be engineered around how the system actually operates.

    Flow and Return Connections

    Suitable temporary flow and return connections are installed at agreed points within the existing circuit. Their position and size are determined by the cooling duty and hydraulic requirements rather than simply where connections are easiest to install. The enabling works can incorporate isolation valves, couplings and associated pipework so temporary hoses can be connected without extensive modification to the permanent system. Valve arrangements are designed so the temporary chiller can be introduced and isolated in a controlled manner, with consideration given to maintaining appropriate system flow through the temporary circuit. Where glycol or another process fluid is used, material compatibility and fluid concentration also form part of the assessment.

    Designing for the Temporary Chiller

    Newsome’s hire fleet covers a broad range of cooling duties, with industrial chillers and ambient coolers available from approximately 5kW through to 1MW. The fleet includes equipment capable of supplying chilled fluid at sub-zero temperatures for more demanding process applications. The enabling works therefore need to reflect what equipment would actually be deployed. For some sites, a single packaged air-cooled rental chiller may provide the required contingency capacity. Larger installations may require multiple units operating together, while applications with different fluid temperatures, process requirements or heat rejection arrangements require a different approach. Newsome engineers establish this during the survey so that connection points are designed around a viable temporary cooling solution, rather than leaving those decisions until the permanent plant is unavailable.

    Talk to a temperature and humidity expert now

    Electrical Provision and Controls

    Temporary chillers require an appropriate electrical supply, and this can become a significant constraint if it has not been considered beforehand. As part of the enabling works survey, Newsome assesses the electrical requirements of the proposed temporary plant and the infrastructure available on site. Where required, suitable electrical provision can be incorporated into the enabling works so that power is available at the proposed temporary chiller location.

    Controls and the intended operating arrangement are considered at the same stage. This is particularly important where temporary equipment will operate alongside existing plant or where maintaining defined leaving water temperatures is critical to the process.

    Positioning, Access and Temporary Pipework Routes

    Finding a suitable location for a temporary chiller is part of the engineering exercise. The proposed position needs sufficient space for the equipment while maintaining the airflow required for heat rejection. Access for delivery, offloading and eventual removal must also be practical.

    Newsome establishes the proposed location during the enabling works survey and considers how temporary hoses, cables and associated equipment will travel between the rental plant and permanent system. This can identify problems that are straightforward to resolve during planned works but considerably more difficult to address during a breakdown. Where necessary, the designated area can be prepared in advance to accommodate temporary plant.

    More Than Emergency Breakdown Cover

    A prepared temporary chiller connection gives engineering teams considerably more flexibility when managing permanent cooling assets.

    A chiller approaching major overhaul can be taken offline with temporary capacity already planned. Cooling can be maintained during replacement projects without making temporary connections part of the critical installation programme. Additional capacity can also be introduced where production requirements temporarily exceed the installed cooling duty. This is particularly useful when working with ageing plant. Instead of delaying essential maintenance because cooling cannot be interrupted, the temporary system provides an alternative source of capacity. Newsome already supplies temporary chillers for breakdown cover, planned maintenance and additional cooling capacity, with turnkey installation support available through its hire operation.

    Chiller Enabling Works Across Different Cooling Systems

    The principles of enabling works remain consistent, but the engineering requirements vary considerably between installations.

    A process cooling circuit operating with a water/glycol mixture below 0°C presents different requirements from a comfort cooling system supplying AHUs. A water-cooled installation requires a different contingency strategy from an air-cooled packaged system, while applications such as MRI cooling or ice production can place particularly strict requirements on temperature stability and continuity.

    Newsome’s wider cooling experience includes process, industrial, packaged, air-cooled and water-cooled chillers together with ambient heat rejection equipment. Its process cooling solutions extend from sub-zero cooling through to higher-temperature applications. This allows the enabling works to be developed around the technical requirements of the existing installation rather than applying a standard connection arrangement.

    A Defined Chiller Contingency Plan

    Once the enabling works are complete, the facilities or engineering team has more than physical connection points.

    There is a known cooling requirement, an identified temporary equipment strategy, agreed connection locations and a practical route for getting temporary plant onto the system. If the permanent chiller subsequently fails, much of the engineering work that would normally precede a rental installation has therefore already been completed. That can materially shorten the route from loss of cooling to temporary capacity being operational.

    Chiller Enabling Works from Newsome

    Newsome can manage the process from initial survey through to installation of the enabling works. Our engineers assess the existing cooling system, establish the temporary duty and connection strategy and identify the mechanical, electrical and site modifications required. The agreed works can then be completed and documented so the site is prepared for future temporary cooling.

    With a nationwide chiller hire operation and 24/7 support, Newsome can subsequently provide the temporary equipment and installation support when it is required.

    Arrange a Chiller Enabling Works Survey

    If continuity of cooling is important to your operation, the practical question is whether a temporary chiller could be connected to your system without first having to redesign or modify it during a breakdown. Newsome can establish that requirement now.

    Contact our engineering team to arrange a Chiller Enabling Works site survey and develop a defined temporary cooling connection strategy for your facility.