Ventilation Enabling Works

Preparing Your Site for Temporary Industrial and Commercial Ventilation

Temporary ventilation can be installed quickly, but only when there is a practical way to move the required volume of air into, through and out of the building.

Newsome provides ventilation enabling works for sites where continuity of mechanical ventilation is important to production, working conditions or the operation of the building. The objective is to establish in advance how temporary ventilation equipment would be installed if permanent plant became unavailable.

For both industrial ventilation enabling works and commercial ventilation enabling works, this means looking beyond the temporary fan itself. Air volumes, duct routes, electrical supplies, equipment positions, existing HVAC infrastructure and the way air moves through the occupied or operational space all need to be considered. By resolving these requirements before they become urgent, temporary ventilation can be deployed against an established engineering plan.

Contact Us Download Brochure

Quick Enquiry

    Understanding What the Existing Ventilation System Is Doing

    The starting point is the existing system. Newsome engineers assess how air is currently supplied and extracted, the areas served and the operating conditions that need to be maintained. Existing fan duties, air volumes, duct sizes, system configuration and controls can all influence the temporary solution. It is also important to understand why ventilation is required.

    In a manufacturing environment, ventilation may be closely associated with production heat loads or general working conditions. Within a commercial building, maintaining suitable fresh air and extract rates may be the principal concern. Other facilities may have individual areas where loss of ventilation has a much greater operational impact than elsewhere on the site. The contingency arrangement can then be developed around the actual requirement rather than assuming that replacing the nominal capacity of the existing fan will necessarily reproduce the required conditions.

    Establishing Temporary Airflow Requirements

    Moving air through an existing building presents different challenges from supplying a temporary boiler or chiller. A fan’s rated airflow cannot be considered in isolation. Available pressure, duct resistance, bends, restrictions, filters, dampers and the configuration of the distribution system all affect the volume of air that ultimately reaches or leaves the required area.

    As part of the enabling works process, Newsome considers the airflow and pressure requirements of the proposed temporary arrangement and how it will interface with the building. This is particularly relevant to industrial ventilation enabling works, where extensive duct networks, large production areas and significant heat loads can make a simple fan-for-fan contingency inappropriate.

    Connecting to Existing Ductwork

    Where existing ductwork can form part of the contingency arrangement, suitable temporary connection points can be designed and installed in advance. Their position needs careful consideration. A convenient connection immediately adjacent to the existing fan may not necessarily provide the most effective arrangement for temporary equipment.

    Newsome assesses how air will travel through the existing system and identifies where temporary supply or extract equipment can be introduced without unnecessary modifications when it is required. The enabling works may include purpose-designed duct connections, blanking arrangements, access points or other modifications that allow temporary ducting to be installed without dismantling significant sections of the permanent system. The objective is a connection that is accessible, appropriately sized and practical for engineers to use when temporary equipment arrives on site.

    Talk to a temperature and humidity expert now

    Temporary Ductwork Routes

    Where the permanent ductwork cannot be used, a separate temporary route may be required. This needs to be established before equipment selection is finalised. Newsome considers the distance between the proposed fan position and the area being served, together with potential restrictions along the route. Long flexible duct runs, numerous changes in direction and reductions in diameter can substantially affect performance.

    Openings through walls, doors or louvres may also need to be considered. If a dedicated temporary connection is appropriate, installing it as part of planned enabling works avoids having to make alterations to the building during a ventilation failure.

    Supply and Extract Need to Work Together

    Effective ventilation depends on the complete air path. Installing temporary extraction without providing sufficient replacement air can create excessive negative pressure and reduce extract performance. Equally, introducing large volumes of supply air without an adequate discharge route may not produce the intended air change.

    Newsome therefore considers both sides of the ventilation strategy. The survey can identify how replacement air will enter the area, where contaminated, warm or stale air will be discharged and whether the temporary arrangement could affect adjoining spaces. This is particularly important where several ventilation systems interact within the same building.

    Electrical Provision for Temporary Ventilation

    Larger industrial fans and air handling equipment can require substantial electrical supplies. Newsome assesses the likely temporary plant alongside the electrical infrastructure available at the proposed installation point. Where suitable provision is not already available, the required electrical works can form part of the enabling project.

    Establishing this beforehand removes another potential delay when temporary ventilation is required. It also means the electrical connection can be designed for the equipment strategy rather than selecting temporary equipment around whatever power happens to be accessible following a breakdown.

    Equipment Positioning and Site Access

    The proposed location of temporary ventilation equipment has a direct influence on system performance. It needs to provide practical access to the required duct connections while allowing sufficient room for the equipment itself, associated ducting and electrical connections. Noise, discharge locations, vehicle movements, pedestrian routes and access for delivery also need to be considered.

    For commercial ventilation enabling works, available plant space can be particularly restrictive. Roof-mounted or internal ventilation systems may not have an obvious location for temporary equipment at ground level. Planning the arrangement in advance allows these restrictions to be identified and a realistic alternative developed.

    Industrial Ventilation Enabling Works

    Industrial sites can present additional challenges because ventilation is frequently integrated into the wider operation of the facility. Production layouts change, machinery generates heat and different areas can have substantially different ventilation requirements. The consequences of losing ventilation may also extend beyond comfort, potentially affecting working conditions or the ability to continue particular operations.

    For this reason, Newsome approaches industrial ventilation enabling works as a site-specific engineering exercise. Rather than trying to reproduce every element of the permanent installation, the contingency strategy can concentrate available temporary capacity where it is actually required to maintain operations. This can result in a more practical temporary system and avoid unnecessarily large rental installations.

    Commercial Ventilation Enabling Works

    Commercial buildings bring a different set of considerations.

    Ventilation may serve multiple occupied areas through centralised air handling and ductwork, with limited space available for temporary equipment. Access can also be constrained by the building layout and the need to minimise disruption to occupants.

    Newsome’s commercial ventilation enabling works establish how temporary ventilation can be introduced within these restrictions. Where appropriate, the existing air distribution infrastructure can be incorporated into the contingency arrangement. Where that is not practical, alternative temporary air paths can be planned so the required areas can continue to receive ventilation while permanent equipment is repaired or replaced.

    Supporting Planned Ventilation Replacement

    Enabling works are equally useful when ventilation downtime is planned.

    Replacing a major supply or extract fan, air handling unit or associated HVAC equipment may require part of the permanent system to remain unavailable while mechanical, electrical and ductwork modifications are completed. Where the affected area needs to remain operational, the temporary ventilation strategy can be implemented before the permanent equipment is isolated. This gives project teams greater control over the programme and reduces pressure to complete major ventilation works within an unnecessarily short shutdown window.

    A Defined Temporary Ventilation Strategy

    Once the survey and enabling works have been completed, the site has a known approach to temporary ventilation. The required airflow has been considered, equipment positions identified, duct connections established, temporary duct routes planned and electrical requirements assessed.

    That preparation removes a significant amount of engineering and decision-making from the period immediately following a ventilation failure. Instead of beginning by asking how temporary equipment could be installed, the engineering team can move directly towards implementing the agreed solution.

    Ventilation Enabling Works from Newsome

    Newsome provides industrial and commercial ventilation services alongside temporary HVAC hire and engineering support. Our engineers can assess the existing installation, determine the requirements for temporary supply and extract ventilation and develop an enabling works package around the specific building or process. Where permanent modifications are required, Newsome can complete the necessary mechanical and electrical works so the site is prepared before temporary ventilation is needed.

    The same strategy can then support an emergency breakdown, planned maintenance programme or future ventilation replacement project.

    Arrange a Ventilation Enabling Works Survey

    If a critical supply or extract system stopped operating, could temporary ventilation be connected without first modifying ductwork, arranging additional power or working out where the equipment could physically be installed? Newsome can answer those questions before they become urgent.

    Contact Newsome to arrange a Ventilation Enabling Works site survey and develop a practical contingency strategy for your industrial or commercial ventilation system.