Drinks,Production, beverage industry

Quick Turnaround Chiller Solution

As result of a of a critical system failure within a chiller unit, which was leading to loss of production due to a long lead time on a replacement component. Newsome’s  hire team supplied, installed & commissioned a 100kW rental chiller to bring production back up to 100% capacity in a matter of hours.